Charlotte County, FL Logo

941.743.1200
默多克圆环18500号
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

海盗港疏浚船

项目描述

Since the last maintenance dredge of a portion of the Pirate Harbor access channel in 2019 new concerns for a need of dredging were brought to the county’s attention. This project will pick up just east of where the last maintenance dredge event left off in the access channel and will in continue east into the systems connector channels. The interior finger canals don't require and are not receiving dredging this event. Most if not all of this project falls outside or west of the governance meander line and is considered aquatic preserve, which means this work is not covered at large by the county wide maintenance dredge exemptions that are in place. Requiring that new maintenance dredge permits are obtained from both US Army Corps of Engineers and FDEP. County consultant Coastal 工程 Consultants will survey and design a project to fit within the proposed limits and to fall within the MSBU budget. The MSBU waterway advisory board approved this project and the funding for it. Along with designing this project CEC will apply and secure permitting for this maintenance dredge event. Once in place this project will go to bid to secure the service of a marine dredging contractor. The target area will receive a dredging and will include construction oversight by both the county and the county consultant. The project will be certified complete through post dredge bathymetric surveys. It is anticipated that permitting may take a year or more to obtain.

项目位置

Portions of the Pirate Harbor access entrance channel and connector canals with the waterway system.

项目的影响

Improved and safer navigation

最新的更新

Coastal 工程 Consultants and county staff has finally received the Army Corps Dredge 许可证 required to move forward with the planned dredge project. CEC also finalized the post Ian bathymetric survey work and submitted an assessment to county staff reporting minimal impacts caused by the storm. Those impacts are too insignificant to be worth application to FEMA. County project management reported those results to the MSBU waterway advisory board and they recommended moving forward with a revised dredge project to fit within budget. 6月28日更新, 2024:  Project management is working out details of project limits and will be working on a bid package in the coming months. 

预算

阶段 成本
工程 $98,930.00
建设 $350,000.00
总预算 $448,930.00
资金来源: 海盗港MSBU.

时间表

阶段 Estimated Start Date 预计完成 实际完成
Planning and Approval 03/10/2021 11/04/2021 11/04/2021
设计开发 02/02/2022 07/31/2024
海盗港疏浚船 Project Image

项目阶段
设计开发

最后一次更新
06/28/2024

项目经理
DeWayne Nodine

公共关系
特蕾西·多尔蒂
Email 公共关系

项目数量
CMD2202.310.00000

支持部门
公共工程

Design Engineer/Architect
Coastal 工程 Consultants

建设 Contractor
TBD

Delivering Exceptional Service

问题? 问题?

欧博体育